抽象的

POST CONSTRUCTION DIAGNOSIS OF REINFORCEMENT IN THE ELEMENTS OF HYDRO ELECTRIC PROJECT

RP Pathak, Sameer Vyas, Pankaj Sharma, NV Mahure, SL Gupta

The hydro projects envisage various concrete structure viz. dam body, foundation galleries, inspection galleries, power house complex, headrace tunnel, tail race tunnel etc. which are constructed using concrete linings of different grades. Its durability is determined by various factors viz. aggressivity of surrounding water, temperatures fluctuations etc. If the water happens to be soft it is injurious to the useful life of concrete as it leads to leaching of lime. Leaching is a phenomenon that is caused by water migrating through the permeable concrete. The permeated water causes corrosion of reinforcement leading to weakening of structure. Once such phenomenon is observed in any such structures a vigilant periodic monitoring approach becomes mandatory. The suitable remedial measure to be adopted will depend on the observed degree of deterioration. In this paper effort has been made to diagnose degree of corrosion of reinforcement at different locations in the power house complex and dam foundation gallery of one of the projects in the state of Himachal Pradesh, India using Half Cell Potentiometer.

免责声明: 此摘要通过人工智能工具翻译,尚未经过审核或验证

索引于

学术钥匙
研究圣经
引用因子
宇宙IF
参考搜索
哈姆达大学
世界科学期刊目录
学者指导
国际创新期刊影响因子(IIJIF)
国际组织研究所 (I2OR)
宇宙

查看更多